The road to owning a house. Week 6 – Walling

Walling. A view from the back. The Yellow stone takes longer to erect than the normal stone. This is because for best result, the contractor is expected to do zero joint i.e. not to have mortar between the stones on the front side as can be seen clearly if you zoom in the photo.
Curing. Water is poured on the slab for a certain number of days to harden it.
Walling. Internal partitions

Walling. Staircase provision
Walling. Machine cut slim stones for internal partitions
Soak pit. Its a bit deeper and wider than normal because the black soil does not absorb the water very well.

Now the walling continues.

Special thanks to the client for allowing us to take the photos and granting us access every week.