#MrsW’shouse – Week 3 Foundation Part 2

Materials Ballast Cement sand stone Hardcore Quarry dust Metal bars for the beams and columns 6*1 wood to form frames for the beams The structural engineer this week made his first site visit to confirm the contractors had reached stable ground where they could construct the foundation of the house. The[…]

Read More »

#MrsW’shouse – Week 2 Foundation Part 1

Items required this week Hose pipe Fork jembes – provided by the contractor Spades – Provided by the contractor Plumb line (Kabiru) Materials  D10 D8 D12 Binding wire This week the contractor started digging the foundation trenches. The land is on a slope of about 2.7m and this week we[…]

Read More »

#MrsW’shouse – Preliminaries and setting out

Construction Preparation This happened as we waited for the approval of the architectural and the structural plans with the county government.   To save on time we did some land preparation. The land had quite a lot of trees which unfortunately were cut down to pave way for construction. The tree stumps[…]

Read More »

#MrsW’shouse – Questions from the readers

The readers had some questions for Mrs W and she was happy to answer them. What is a cantilever/Double volume A Cantilever is a slab that appears to be floating.  it doesn’t have visible beams/ columns supporting it and it is also not attached to any side of the wall. […]